![]() |
|
|
Product Details:
Payment & Shipping Terms:
|
Protection Level: | IP55 | External Size: | 800*900*1800mm |
---|---|---|---|
Type: | Distribution Box , Network Cabinet , Control Box , Telecom Outdoor Cabinet , Outdoor Cabinet For BTS | Material: | Galvanized, Double Wall With Insulation |
Color: | RAL7035 GREY | Structure: | Front Door |
Surface Finish: | Sandblasted , High Polishing , Brushed , Powder Coating |
Front Access Outdoor Telecom Cabinet IP55 Galvanized Steel With UPS PDU
1. Cabinet Instruction
This series IP55 Outdoor cabinet with front access offers the ideal enclosure solution to build the whole base station inside.The cabinets system can support Electrical equipments,PDU,Backup batteries,
Mornitoring system and etc.This series enclosures offer all the protection needed for outdoor requirements.Ultimate security is provided by a three-point locking system.It can offer perfect solution for the outdoor telecomunication application.
2. Cabinet Features
External Size | W*D*H 800*900*1800mm |
Mounting type |
Floor mount |
Material |
Galvanized steel ,double wall with insulation |
Cabinet Layout |
One compartment |
Door limit |
Up to 110 degree open angle |
Protection Level |
IP55 |
Cabinet Inlets | From cabinet bottom |
Illumination | DC48V LED lamp |
Grounding Protection | Copper bar |
Color | Grey (support custom made) |
Coating | Anti-corrosion outdoor powder coating |
Alarm sensors | The door sensor, water sensor, smoke sensor, temperature and humidity sensor |
Flame retardant | Comply with GB5169.7 test A |
Door type |
With one front door and one back door anti-theft 3hree point lock for outdoor cabinet (support padlock). |
Cabinet Lock | Anti-theft three point lock(support padlock) |
Accessories | PDU,UPS,EMS optional |
Package | Wooden case with pallets |
Certificates | CE |
3. Cabinet Cable Entry Method
There are entrance holes individually for power cable, signal cable and optical cable from cabinet bottom.
4. Cabinet Connection
(1) Use anti-loose threaded connection as structure and bearer connection.Anchor bolt for fixing cabinet use hot dip galvanized bolts.
(2) Door hinges use inner hinge mode.
5. Cabinet Pictures
6. Cabinet Production Pictures
7. Leading Time
Usually about 10-15 days. The exact lead time need to be confirmed according to the quantity of order.