TIANJIN ESTEL ELECTRONIC SCIENCE AND TECHNOLOGY CO., LTD

 

We are the professoinal supplier of outdoor telecom cabinet, air conditioner, heat exchanger, and telecom power system.

Sales & Support
Request A Quote - Email
Select Language
English
Portuguese
中文
Home
Products
About Us
Factory Tour
Quality Control
Contact Us
Request A Quote
Home ProductsAC220V Air Conditioner

TC06-30JFH/01,AC220V 300W Air Conditioner,For Outdoor Telecom Cabinet/Room/Base Station

Certification
Good quality Two Compartments Outdoor Telecom Cabinet for sales
Good quality Two Compartments Outdoor Telecom Cabinet for sales
Timely response, professional skills, rigorous attitude, fast delivery, we are very satisfied, cooperation is very smooth.

—— Manish

From 1 sample to 45 sets, 76 sets, 200sets, we gradually established a strong trust. The cabinet quality is good and the design is reasonable.

—— Parmar

In the past three years, our cooperation is very cheerful, thanks for your company's technical support and patient service, the end user is very satisfied with the quality of outdoor telecom cabinet with cooling. Best wishes to our future cooperation.

—— Anthony

The air conditioner have been running for one and a half years. Cooling effective is good. Good after-sale service, and patiently instruct to use and solve technical problems. Environmental monitoring system is also running well, and remote monitoring the cabinet is very convenient.

—— Luis Alberto

I'm Online Chat Now

TC06-30JFH/01,AC220V 300W Air Conditioner,For Outdoor Telecom Cabinet/Room/Base Station

China TC06-30JFH/01,AC220V 300W Air Conditioner,For Outdoor Telecom Cabinet/Room/Base Station supplier

Large Image :  TC06-30JFH/01,AC220V 300W Air Conditioner,For Outdoor Telecom Cabinet/Room/Base Station

Product Details:

Place of Origin: China
Brand Name: ESTEL
Certification: ISO9001:2008
Model Number: TC06-30JFH/01

Payment & Shipping Terms:

Minimum Order Quantity: 1 Set
Packaging Details: Wooden Case
Delivery Time: 15 days
Payment Terms: T/T
Supply Ability: 8000 Sets Per Year
Detailed Product Description

AC220V 300W Air Conditioner

Model: TC06-30JFH/01

1. Introduction And Application Scope

TC06-30JFH/01 Air Conditioner is a full automation temperature control product. It uses intelligent controller to control the whole system of the air conditioner. According to the variation of environment temperature, the intelligent controller can automatically detect, operate and record the whole system’s operating time, power consumption, event and historical data. It can store 100 event records and 1280 historical data records, and can enquire 256 days’ daily record information. The product is widely applied in telecom cabinet, small and medium sized telecom room, UPS room, outdoor base station room, etc.
 
2. Features
 
(1)Strong adaptability
(2)High intelligence 
(3)High precision
(4)High reliability
(5)Low noise 
(6)Low energy consumption
(7)With 4 way switching value detection
(8)With 1 way room air conditioner control
     Voltage input range: 220VAC±15%  50/60Hz
     With dry contact alarm output 
 
3. System Principle Diagram
 
TC06-30JFH/01,AC220V 300W Air Conditioner,For Outdoor Telecom Cabinet/Room/Base Station

Diagram 1: System Principle Diagram

 

4. Standard Compliance

Table 1  Standard Compliance

Standard 

Description

GB/T 17626.7-1998 

Electromagnetic compatibility 

GB4706.1

Safety of household appliance and electrical appliance with similar use.

GB4798.1

Environmental conditions existing in the application for electric and electronic products - storage

GB4798.2

Environmental conditions existing in the application for electric and electronic products - transportation

GB4798.3

Environmental conditions existing in the application for electric and electronic products - usage

CE

Third party certificate

 
 
5. Technical Parameters
 
300W 220VAC Air Conditioner (Model: TC06-30JFH/01)
 

Environmental Performance

working environmental temperature

-20°C ~ 55°C

storage temperature

-40°C ~ 70°C

working humidity

≤95%

Thermal Performance

rated cooling capacity

350W(L35 L35)

300W(L25 L35)

heating input power 

500W (optional)

 

Electrical Performance

rated input current 

0.9A(L35 L35)

0.7A(L25 L35)

rated input power 

198W(L35 L35)

154W(L25 L35)

input voltage

AC220V/50Hz (185V~264V)

TC06-30JFH/01,AC220V 300W Air Conditioner,For Outdoor Telecom Cabinet/Room/Base Station

 Diagram 2:  Dimension of 300W 220VAC Air Conditioner

6. Installation and Electrical Wiring Instruction

6.1 Preparation Before Installation
 
(1) Prepare the tools in the following table “Installation And Maintenance Tools”.
(2) Check the air vents to ensure there’s no unnecessary items on the vents.
 
6.2 Installation And Maintenance Tools
 

Tools Name

Function

Cross Screwdriver

Fix air conditioner.

Small Slotted Screwdriver

Wire power supply port on the panel

Wire Stripper 

Wire stripping 

Wire Crimper

Crimp power supply for equipment

Multimeter

Check the wiring to ensure it’s correctly connected and without short circuit.

Clamp Meter

Test operating current of the air conditioner

 
6.3 Installation Steps
 
(1)Make sure the air conditioner is not connected with power.
(2)Fix the air conditioner according to the Dimension Diagram.
(3)Strip the insulation of the power supply wire, and crimp the terminal.
(4)Connect the wires according to the Electrical Wring Diagram.
(5)After finishing the wiring, use the multimeter to check if the electric circuit is normal. Then connect the air conditioner with power supply, and use clamp meter to test the operating current. 
Note: Make sure to disconnect all the power supply to the air conditioner before installation. Choose proper wire diameter and test operating current according to the technical parameters of the air conditioner.
 
 
6.4 Electrical Wiring Diagram
TC06-30JFH/01,AC220V 300W Air Conditioner,For Outdoor Telecom Cabinet/Room/Base Station
Diagram 3: Electrical Wiring Diagram
Wiring Ports:
 
L  N  PE : power supply port (voltage input: 220VAC±15% 50/60Hz)
F+  F- : direct ventilation output port 
AL1  AL2: general alarm output port
A+  B-  SGND : RS485 communication port
N : not connected pin
 
7. After Mechanical Installation And Electrical Installation Are Finished, Check The Installation Items.
 
(1)Make sure the air conditioner is firmly installed.
(2)Check the electrical installation circuit, and ensure it doesn’t have short circuit.
(3)Check the air outlet, air inlet, internal fan and external fan of the air conditioner, and ensure they don’t have any odds and ends.
(4)Connect the air conditioner to power supply, and test the power supply (voltage input: 220VAC±15% 50/60Hz), operating current 0.8A±4%.
 
8. System Control 
 
8.1 Function and Application
 
ET731 intelligent air conditioner controller is a universal intelligent controller, controlling with highly integrated STC SCM. It can intelligently control thermostatic cabinet air conditioner working and hydrogen exhausting, including functions such as fault self diagnosis, power-on self start, or restart after unexpected failure caused by other reasons. The controller is compatible with all types of air conditioners in the market.
 
The controller, with the features of advanced performance, easy installation and setting, are widely used in telecom cabinet, small and medium sized telecom room, UPS room, outdoor base station room, etc.
 
8.2 Technical Parameter
 
a.2×16 Chinese/English shift LCD display, user friendly; 
b.Simultaneously display temperature and humidity inside the box and communication room temperature;    
c.Temperature measurement accuracy: 0.1 °C; humidity measurement accuracy:5%;
d.Can store 180 days’ daily event record, 1 record every day;
    Daily highest temperature, lowest temperature, average temperature
    Daily event record;
e.Save the former day’s daily data at 0:00 every day; Can query 180 days’ daily record information;
f.RS485 communication, YD/T 1363.1-2005 standard protocol, support remote detection and control;
g.Control mode: pulse (Non dry contact air conditioner), conducting (dry contact air conditioner)
h.Real-time control air conditioner on/off
i.Power supply: AC185V~264V/50HZ;
j.Power consumption:≤5W;
k.Working environment: -30°C~70°C; <90%RH;
l.Installation method: guide rail,hanging;
m.Dimension(L*W*H):150mm×190mm×45mm
 
8.3 Operating Instruction
 
ET731 uses English interfaces, which can be operated easily. All the operations can be realized with four buttons. The following is the control board diagram:
TC06-30JFH/01,AC220V 300W Air Conditioner,For Outdoor Telecom Cabinet/Room/Base Station
Diagram 4  Control Board Diagram
 
 
8.3.1 Buttons
PgDn:page down button, confirm button.      
Press once and release the button, page down;
A long press on the button, enter or exit parameter status;
At operating status: can select three display interfaces;
At parameter status: revise, confirm and parameter page down button; a long press on the button to exit parameter status.
 
▲:increasing parameter revision. Page down button for event query.  
 
▼:decreasing parameter revision. Page up button for event query.
 
PgUp: page up button; the function is oppose to PgDn operation.
8.3.2 Operating Interfaces 
The controller includes four types of working modes: operating mode, parameter mode, manual operating mode, and query mode.
 
(1) Operating Mode:
 
The mode is normal working mode. There are three operating interfaces which can be selected. The three interfaces display different content. When they are not selected, the interfaces will automatically shift. Press the button “PgDn” to select next display interface; press the button “PgUp” to select the previous display interface.   
 
Interface 1: 
 
Line 1: temperature and humidity inside the thermostatic box (or area I);
Line 2: box air conditioner status, real time clock;
※------- cooling start sign;
☼  ------- heating start sign;
♂  ------- hydrogen exhaust/direct ventilation sign; 
--  ------- compressor/ heater stop working.  
 
Interface 2: 
 
Line 1: environment (or area II) temperature and humidity;
Line 2: inside and outside coil temperature display (T3, T4);
 
Interface 3: 
 
Circularly display current alarms;
When multiple alarms occur, it will display each alarm information circularly.
 
(2)Parameter Mode:
 
At operating status, long press on the button”PgDn” for around 3 seconds, or press the button”PgUp” at interface 1, to enter parameter mode.The first entered interface is the main menu interface, see the following diagram.
 
TC06-30JFH/01,AC220V 300W Air Conditioner,For Outdoor Telecom Cabinet/Room/Base Station
Press the button “▲”, “▼” to choose corresponding parameter group; Press ”PgDn” to enter corresponding parameter group; Press ”PgUp” to return to operating mode. The parameters selection includes:
 
(a) Observation Parameter 
(b) Control Parameter Revision 
(c) Basic Parameter Revision 
(d) Manual Operation 
(e) Event Query 
(f) Return To Operating Mode 
 
(a)Observation Parameter Group (Apar):
 
Enter the interface to check some parameters which can’t be checked at operating mode, see “9 Parameters”. 
 
At parameter mode: on the left of line 1 is Parameter No. (PAnn); on the right of line 1 is parameter value. Line 2 shows the remark of the parameter.
 
(b) Control Parameter Group (CPar):
 
Enter the interface to observe or revise the parameters which can be revised, see “9 Parameter”. 
 
At parameter mode: on the left of line 1 is Parameter No. (PCnn), on the right of line 1 is parameter value. Line 2 shows the remark of the parameter.
 
(c) Basic Parameter Group (BPar): 
 
Enter the interface to observe or revise the parameters which can be revised, see “9 Parameter”. 
 
At parameter mode: on the left of line 1 is Parameter No. (PBnn), on the right of line 1 is parameter value. Line 2 shows the remark of the parameter.
 
(d) Manual Operation:
 
Enter the interface to select “Cool”, “Heater”, “Air”, “Initpar”, “Aoauto” to conduct manual start and stop operation.
 
(e) Event Query (Query):
 
Enter query mode.
 
 
8.4 Wiring Diagram
TC06-30JFH/01,AC220V 300W Air Conditioner,For Outdoor Telecom Cabinet/Room/Base Station
Diagram 5: Wiring Diagram
Board Instruction:
 
The board is divided into four blocks: F1, F2, F3, F4 (F4 is on the back).
 
When using non-adjustable speed fans:
All the parts in F1 should not be welded;
Parts in F2 should be welded;
Resistance in F4 (RS01, RS02) should be welded; JP1, JP2 should be short circuit; JP3, JP4 should short circuit 1-2.
 
When using speed adjustable fans:
All the parts in F1 should be welded;
Parts in F2 should not be welded;
Parts in F4 should not be welded and should not be short circuit.
 
F3 should be considered only when connecting coil temperature. In general case, it doesn’t need to be considered and should not be welded.
 
Wiring Instruction:
 
1.JD1: 48V input;
2.JD2: 48V heating output;
3.JD3: fan control terminal
   
   Speed adjustable fan wiring method:
   1- 48V output, fan power supply;
   2- C1 internal circulation fan control; 3- F1 internal circulation fan speed;
   4- C2 external circulation fan control; 5- F2 external circulation fan speed;
   6- 0V fan power supply grounding.
 
   Non speed adjustable fan wiring method:
   1, 6 ― not connected;
   2, 3 ― connected with internal circulation fan (2+, 3-);
   4, 5 ― connected with external circulation fan (4+, 5-);
 
4.JD4:
  1, 2: hydrogen exhaust/direct ventilation control, dry contact, normal close output;
  3, 4: dry contact output, normal open, system alarm output;
  5, 6: dry contact output, normal open, cooling system alarm output.
 
5.JD5: compressor power supply: 1-L input; 2-N common; 3-L output.
6.JD6: DI input;
7.JD7: RS485 communication 
8.J1: connected with LCD12232;
9.J2: connected with button;
10.J3: connected with temperature and humidity sensor 1 (inside cabinet);
11.J4: connected with temperature sensor (ambient);
12.J5: connected with temperature and humidity sensor 2 (backup);
13.J6: connected with NTC1 ( inner coil);
14.J7: connected with NTC2 ( outer coil);
15.J8: programming port.
 
9. Maintenance
 
Maintenance Tools:
 
(1)Vacuum cleaner or compressed air cleaning agent 
(2)Soft brush
(3)Cross screwdriver
(4)Multimeter
(5)Clamp meter
(6)Digital thermometer
 
In order to keep normal temperature environment inside the cabinet, please conduct maintenance according to the “Maintenance Table”.
 
Maintenance Steps:
(1)Turn off the power.
(2)Disconnect the power line, and disconnect the signal line.
(3)Conduct maintenance according to the “Maintenance Table”.
(4)Connect the power line and signal line.
(5)Operating testing program. 
(6)Disconnect the power, restore the normal operating status.
(7)Connect the power.
(8)The equipment installation should reserve a maintenance space not less than 300mm.
 
Maintenance Table 
 

Check Items

Step Description

Maintenance Cycle 

Casing

Use brush or vacuum cleaner to clean the odds and ends on the casing.

6 months

Wiring

Check if it gets loose and if the power supply voltage is normal. 

6 months

Fans Abnormal

Move the fans to check if the rotation is smooth, and if there’s abnormal noise or odds and ends.

6 months

Cooling Fin

Use brush or vacuum cleaner to clean the dust on the cooling fin; use water or compressed air to clean the condenser.

 6 months

Water Drainage

Check if the water drainage pipe is smooth

1 year

Cooling/Heating

At normal operating status, the measured temperature difference between inside and outside temperatures is higher than 10°C.

1 year

Cable 

Check if cable peeling occurs. 

1 year

Communication Cable

Check if the cable includes hidden danger such as peeling. 

1 year

Grounding Cable 

Test if the equipment grounding  and cabinet grounding is normally connected, and the resistance is lower than 0.1Ω.

1 year

 

Failures

Failure

Analysis

Air conditioner doesn’t work

Without power input or internal power line may peel.

Temperature failure alarm

The temperature probe terminal may be loose, or the probe doesn’t work. 

Fans don’t rotate.

Check if the power supply is normal, if the cables peels or fan blades are blocked by odds and ends.

Fans have abnormal noise. 

fan blades are interfered by odds and ends, or fans are damaged.

Can’t drain condensated water.

The water drainage pipe is blocked.

 
                   

Contact Details
TIANJIN ESTEL ELECTRONIC SCIENCE AND TECHNOLOGY CO., LTD

Contact Person: Ms. Fiona Liang

Tel: 86--13752765943

Send your inquiry directly to us (0 / 3000)